
T10Pro
IMU test procedure
See the T10Pro receiver on an IMU test fixture.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 0:46
Watch the T10Pro temperature-chamber test procedure.
The clip shows the receiver, chamber controls and handling before and after the illustrated exposure.
Confirm the temperature profile, dwell time, powered state and recovery period. Review the post-test functional checks and the declared operating range for the exact model.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T10Pro
See the T10Pro receiver on an IMU test fixture.
Watch video & read test notes
T10Pro
Watch the T10Pro water-immersion test setup and handling.
Watch video & read test notes
T10Pro
See the T10Pro PPP positioning demonstration and field screens.
Watch video & read test notes