
T10Pro
Water immersion test
Watch the T10Pro water-immersion test setup and handling.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 1:15
See the T10Pro receiver on an IMU test fixture.
The supplied clip shows the receiver being prepared and positioned on a calibration fixture.
Confirm firmware, initialization, pole height and supported tilt workflow. Validate tilt measurements against known control points before accepting survey results.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T10Pro
Watch the T10Pro water-immersion test setup and handling.
Watch video & read test notes
T10Pro
See the T10Pro PPP positioning demonstration and field screens.
Watch video & read test notes
T10Pro
See the T10Pro receiver in a UV-exposure test workflow.
Watch video & read test notes