
T10Pro
IMU test procedure
See the T10Pro receiver on an IMU test fixture.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 2:07
See the T10Pro PPP positioning demonstration and field screens.
The supplied footage presents a PPP positioning workflow with device or controller views.
Confirm supported correction service, subscriptions, firmware, convergence time and sky visibility. Compare against control points and define your required accuracy and repeatability.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T10Pro
See the T10Pro receiver on an IMU test fixture.
Watch video & read test notes
T10Pro
Watch the T10Pro water-immersion test setup and handling.
Watch video & read test notes
T10Pro
See the T10Pro receiver in a UV-exposure test workflow.
Watch video & read test notes