HYDROGRAPHIC SURVEY

Hydrographic Survey Equipment and Workflows

A hydrographic survey setup starts with the site and the required deliverables. Tell us the waterbody, expected depth, launch conditions and required data format so we can help you select the vessel or platform, positioning method and depth sensor.

Request a survey configurationExplore workflow

TOKNAV hydrographic survey vessel operating on water

PROJECT CONTEXT

Before selecting a hydrographic workflow, define the body of water, expected depth conditions, access and launch constraints, survey lines, required positioning reference and the software or file format used by the project. These factors determine the practical conversation around a vessel, positioning equipment, sensors and power or communication arrangements.

TOKNAV can use these project inputs to identify a relevant water-survey route and current documentation. The public page does not assume a single configuration is right for every river, lake, reservoir or near-shore project; a documented selection discussion is needed before final equipment and integration decisions.

PRACTICAL WORKFLOW

Build the field process before confirming equipment.

1

Define the water-survey task

Share the water body, access conditions, expected depth range and planned deliverables.

2

Confirm the positioning reference

Review the correction or control source and how the project will establish position.

3

Plan the platform

Discuss vessel or USV context, power, communications, payload and launch conditions.

4

Review collection records

Clarify field software, survey lines, quality checks and export requirements.

5

Document the configuration

Keep the versioned equipment and operating record with the project handover.

WHAT TO PREPARE

Information that leads to a useful technical discussion.

Survey environment

Describe water type, access, weather exposure and launch or recovery constraints.

Positioning and sensors

State the planned GNSS correction route and any existing sensor or data-collection requirements.

Handover format

Identify the client’s required records, file outputs and coordinate reference.

FAQ

Frequently asked questions

What should I send for a hydrographic project discussion?

Send the water environment, location or country, depth conditions, platform preference, positioning method and expected deliverables.

Can a USV be selected from a photo alone?

A photo is not enough for a responsible selection. TOKNAV needs the survey environment, payload, communications and project workflow.

Where can I review hydrographic products?

Start at the hydrographic USV product route, then request the current product documentation for the intended project.

Choose equipment by survey conditions

Match the platform and sensor to the job. For a river cross-section, consider access, draft and how you will space the survey lines. For a reservoir or larger work area, review launch and recovery logistics, survey coverage and the payload the platform must carry.

Equipment to discuss by survey task
Survey taskEquipment and information to check
River cross-sectionsLaunch access, platform draft, depth sensor, and cross-section spacing.
Reservoir or lake mappingCoverage, payload capacity, GNSS corrections, water levels, and required sounding density.
Asset or shallow-water inspectionWater depth, access constraints, sonar or imagery requirements, and the intended deliverables.

Plan positioning and depth measurement

Identify the coordinate reference and water level reference before selecting the positioning and depth-measurement equipment. Ask whether the project needs cross-sections, a depth surface from wider coverage, or additional imagery. Record the intended checks before starting the survey.

Define your survey deliverables

Agree the required sounding points, cross-sections, grid or report with the client. Document units, horizontal and vertical references and the checks supplied with the results.

How do bathymetric and hydrographic surveys differ?

Bathymetry maps water depth and the shape of the bed. A hydrographic survey may also record other features and water conditions, depending on the project.

PROJECT ENQUIRY

Ready to discuss the practical details?

Send the application, country, workflow and any existing project context. TOKNAV will begin with a documented equipment discussion.

Contact TOKNAVWhatsApp