TOKNAV Case Studies

Explore customer-shared field photos and practical equipment workflows. Find the application closest to your work, then discuss the configuration your team needs.

Customer field photos · Philippines

TBoat20 equipment preparation beside the water

A TBoat customer in the Philippines shared these photos of unpacking the equipment and preparing the vessel beside the water. They offer a closer look at transport, handling and setup before operation.

These photos document equipment preparation; they do not present survey results or measured project outcomes.

Explore the TBoat20 USV and the hydrographic survey equipment workflow to plan the vessel, positioning and sensor requirements for your own work.

Application guides

Prepare a workflow for your next project

Use these guides to define the task, correction method and field checks before choosing equipment.

RTK surveying with T40Pro

Review receiver setup, correction access and independent field checks before starting survey or stakeout work.

Read the T40Pro field workflow

Discuss your equipment configuration

Tell us your country, application, site conditions and required deliverables. Our team can help you identify the product and configuration questions to review.

Discuss your project