A line marking robot is most effective when field layout, positioning reference, paint system, operator workflow and acceptance standard are set before the first line is drawn.
What to check before choosing a workflow
- Confirm the field template, dimensions and reference points.
- Plan GNSS or local positioning conditions around the venue.
- Agree paint, line width, turnaround time and inspection criteria.
What should venue operators prepare before using a line marking robot?
Prepare the approved field layout, the positioning reference, paint and line specifications, a clear operating route, and a simple inspection checklist for finished markings.
Editorial update: 17 November 2026. The original archive date is retained; use the current model documents when specifying equipment.
TR10 or TR10Pro: choose the marking task first
A marking robot should be selected around the finished work you need. Road pre-marking and sports-field line painting require different layouts, surfaces and spraying arrangements. The TR10 name alone does not establish that a particular configuration can perform both jobs.
Road and construction pre-marking
For the TR10 road pre-marking workflow, specify whether the deliverable is a reference line, dots or another approved layout. Pre-marking identifies where later work should go; it should not be treated as a guarantee of the finished road marking’s material, thickness or service life. Provide the design file, coordinate system, units and direction of travel before the demonstration.
Sports-field line marking
For a sports venue, review the field-marking workflow and the proposed TR10Pro configuration. Confirm the required sport, approved dimensions, surface condition, paint compatibility and line width. A stored template still needs to be aligned to the venue and checked against the layout approved by its operator.
A useful demonstration has an acceptance record
- Define the job: supply a representative layout and identify the actual surface, access route and obstacles.
- Check positioning: agree the correction source, control points and procedure for stopping and recovering if positioning quality deteriorates.
- Test the marking arrangement: confirm the material and spraying setup on a suitable test area before marking the production surface.
- Inspect the result: check alignment, dimensions, intersections and visible line quality using the project’s agreed method. Keep photographs and the source design with the result.
What affects daily output?
Setup, travel between work areas, refill and cleaning time, surface condition, correction coverage and inspection all affect the completed work per shift. Compare demonstrations using the same scope. A travel-speed figure or battery rating alone cannot establish a finished-area productivity claim.
Can one quotation cover several applications?
Yes, but list each application separately so the proposed hardware, marking mechanism, software, accessories and training can be confirmed. Use the marking robot overview to identify the equipment path, then request a private configuration review with a layout sample and site details.
