
T50Pro
Water immersion test
Watch the T50Pro water-immersion test setup and handling.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 0:45
See the T50Pro receiver on an IMU test fixture.
The supplied clip shows the receiver being prepared and positioned on a calibration fixture.
Confirm firmware, initialization, pole height and supported tilt workflow. Validate tilt measurements against known control points before accepting survey results.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T50Pro
Watch the T50Pro water-immersion test setup and handling.
Watch video & read test notes
T50Pro
Watch the T50Pro salt-spray chamber test procedure.
Watch video & read test notes
T50Pro
See how the T50Pro receiver is handled during drop testing.
Watch video & read test notes