
T50Pro
IMU test procedure
See the T50Pro receiver on an IMU test fixture.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 0:51
See how the T50Pro receiver is handled during drop testing.
The clip shows the receiver, the drop-test setup and product handling after the impacts.
Confirm drop height, impact surface, orientations and number of drops. Review housing, connectors, power and positioning checks after the test.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T50Pro
See the T50Pro receiver on an IMU test fixture.
Watch video & read test notes
T50Pro
Watch the T50Pro water-immersion test setup and handling.
Watch video & read test notes
T50Pro
Watch the T50Pro salt-spray chamber test procedure.
Watch video & read test notes