
TOKNAV PRODUCT FOOTAGE · 0:58
T5 Drop test
See how the T5 receiver is handled during drop testing.
What this video shows
The clip shows the receiver, the drop-test setup and product handling after the impacts.
What to check for your project
Confirm drop height, impact surface, orientations and number of drops. Review housing, connectors, power and positioning checks after the test.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →Related product videos


T5
PPP positioning demonstration
See the T5 PPP positioning demonstration and field screens.
Watch video & read test notes

