
T5
PPP positioning demonstration
See the T5 PPP positioning demonstration and field screens.
Watch video & read test notesTOKNAV PRODUCT FOOTAGE · 1:05
See the T5 receiver on an IMU test fixture.
The supplied clip shows the receiver being prepared and positioned on a calibration fixture.
Confirm firmware, initialization, pole height and supported tilt workflow. Validate tilt measurements against known control points before accepting survey results.
Supplied by TOKNAV. This edited demonstration documents the setup shown; it does not replace a test report or a project-specific acceptance check.
Read the setup and field-check guide →
T5
See the T5 PPP positioning demonstration and field screens.
Watch video & read test notes
