Delivery planning starts with an accurate configuration. Confirm the complete receiver package, accessories, destination, import process, documentation and commissioning need before asking for a shipment schedule.
What to check before choosing a workflow
- Record the receiver, controller, antenna, radio and power configuration.
- Confirm delivery address, importer details and local clearance needs.
- Allow time for commissioning, training and known-point validation.
What details should be supplied when requesting GNSS equipment delivery?
Provide the proposed configuration, quantity, destination, project date, contact details, required documentation and any import or on-site commissioning constraints.
Editorial update, 17 November 2026. Use the current model documentation when selecting equipment; this article retains its original archive date.
Define which delivery milestone the project needs
An equipment request should distinguish a confirmed configuration, readiness for dispatch, carrier collection, receipt at the destination and readiness for field use. These are different milestones. An estimated dispatch date does not establish an arrival date, and arrival does not establish that the complete working system is ready for the crew.
Attach the schedule to an identifiable configuration
Use exact model names and the agreed equipment list when asking for an update. For example, the T40Pro product record describes removable field batteries, while the TBoat comparison distinguishes bare-hull weight from an equipment-package total. Neither description establishes which accessories are included in a particular shipment. Keep the order’s package definition with its delivery discussion.
Ask what each status update means
A proposed delivery record can distinguish equipment allocated to the order, packing completed, collection arranged and collection confirmed. Ask which event has actually occurred and which remains an estimate. If an item is supplied separately, identify the affected package and its intended destination rather than assuming that one tracking reference represents the entire order.
At receipt, compare the packages and model identifiers with the agreed list and retain any discrepancy for the order contact. Keep physical equipment separate from software activation, documentation and training arrangements, which may have their own delivery steps. This is a proposed communication method, not a promise that every TOKNAV order includes those services.
Keep project readiness separate from transit
Reserve time for the agreed setup and familiarisation after the required equipment and information are available. Ask for order-specific estimates and responsibilities through TOKNAV’s delivery and product enquiry route. Provide the destination and the date the project actually needs the system in use.
No universal stock position, dispatch interval, carrier arrangement, customs outcome or tax-inclusive service is established here. Confirm those details for the exact order and destination instead of relying on an archived general shipping claim.