Review source information
Identify the current design or control record and the person responsible for approving it.
CONSTRUCTION
Construction teams need a position source they can connect to a defined site process: model review, control checks, field layout, operator use and documented change handling.

PROJECT CONTEXT
Construction positioning begins before the equipment is installed or sent to site. The project team needs a clear version of the design model or coordinate-control record, known control points, a correction route and a defined owner for changes. This prevents a working machine or layout crew from relying on an outdated file or unresolved site condition.
TOKNAV discussions are structured around the application rather than unsupported outcome claims. Tell us whether the work involves construction layout, grading, machine guidance or an automation workflow, then provide the machine context, project country, file source and expected interface. We can identify a relevant equipment route and the documentation that should be checked before deployment.
PRACTICAL WORKFLOW
Identify the current design or control record and the person responsible for approving it.
Check the coordinate reference, correction route and site conditions before field use.
Match the construction task to a rover, guidance or automation discussion path.
Document the configuration, file version and pre-work checks for the field team.
Record unexpected site conditions or control conflicts before the workflow continues.
WHAT TO PREPARE
Specify the file source, coordinate reference and version-control responsibility.
Share the machine type or layout workflow so the relevant integration discussion can begin.
Describe connectivity, control availability and any physical constraints visible on site.
RELATED TOKNAV ROUTES
Review current receiver families and begin an equipment discussion.
Explore products →Use an application-led guide before narrowing to a product model.
Compare routes →Send the job, country, field environment and expected deliverables.
Talk to TOKNAV →FAQ
Confirm the approved model or control record, coordinate reference, version, change owner and operator pre-work review path.
Yes. Provide the application, machine or layout context, country, source files and intended workflow for a documented discussion.
No. Project outcomes depend on the approved workflow, site conditions, control, equipment configuration and operator process.
PROJECT ENQUIRY
Send the application, country, workflow and any existing project context. TOKNAV will begin with a documented equipment discussion.