TMC10 and TMC20 Machine Control Applications

TOKNAV's TMC10 and TMC20 address different earthmoving workflows: TMC10 provides dozer 3D guidance, while TMC20 is intended for excavator guidance. Define the machine and the work to be performed before reviewing positioning, installation and software requirements.

Match the system to the machine

For a dozer, review the blade configuration, project surface and the operator's guidance workflow. For an excavator, review the boom, stick and bucket geometry, attachments and intended excavation task. Confirm the actual functions supplied with the configuration; guidance and automatic hydraulic control must be distinguished in the equipment proposal.

Use the current TMC20 product information when discussing an excavator installation. Provide machine and attachment details with the enquiry.

Establish the project reference

Confirm the survey control, coordinate system, elevation reference and design-file format. Check correction-service coverage and communications where the machine will operate. The installation and calibration procedure should be agreed with the supplier and the site team.

Commission before production work

  • Verify sensors, mounting, power and communication connections.
  • Confirm machine geometry and calibration for the installed attachment.
  • Load a checked design and confirm its units and reference system.
  • Compare indicated positions or elevations with independent survey checks.
  • Agree operator training, recheck intervals and the response to lost corrections.

Repeat the relevant checks after changing attachments, calibration or project settings. Keep an installation and acceptance record so the team can investigate differences later.

Frequently asked questions

What should an equipment enquiry include?

Send the country, machine make and model, application, attachments, correction source and design-file format. Explain whether you need operator guidance or another control function.

Can GNSS guidance replace site quality control?

Independent verification remains part of the workflow. Agree checks and tolerances for the finished work with the project's survey and construction teams.

Plan your equipment selection

Review the product information and the machine guidance and agriculture workflows for the configuration you are considering. Share your country, application and preferred model so our team can help you review current documentation and equipment options.

Discuss your equipment requirements