TOKNAV HYDROGRAPHIC PROJECT AND DATA-QUALITY CHECKLIST Prepared 2026-10-22 PROJECT BRIEF Country and waterway: Minimum / maximum depth and units: Survey area or route length: Current, debris and launch access: Required deliverable and reference system: Preferred sonar / ADCP (optional): Project timing: CONFIGURATION Vessel and sensor models / revisions; permanent mounts; loaded draft; lowest component. Positioning, heading and attitude inputs; correction service; synchronization and offsets. Power, waterproof connections, acquisition software, licenses and export formats. QUALITY RECORDS Preserve original sonar and positioning files. Record coordinate / vertical references and applicable sound-velocity, water-level and sensor corrections. Document processing, rejected data, reacquisition and interpolated regions. Record independent checks and compare them with the project acceptance criteria. This is a planning checklist, not a measured dataset or certification. Request project advice: https://toknavgnss.com/tboat-usv-hydrographic-survey/#project-form Read examples: https://toknavgnss.com/hydrographic-survey-data-examples/